← Glossar

Pack gate

The intake check that accepts a goods specification pack and refuses service proposals and works or install packs. Same compiler; wrong file type does not enter write-back.

The pack gate is the first step of Orbid. The desk brings the spreadsheet the buyer sent. If the pack is a goods specification workbook — locked cells, required rows, catalog-shaped columns — it proceeds to catalog match and write-back. If the pack is a service proposal, a construction scope, or an install bundle, Orbid refuses it. The product does not write prose bids.

Why a gate exists

A goods cell is a SKU commitment. A service line is a different job. Mixing them on one compiler would invent answers the factory cannot ship. The gate keeps the original-file promise honest.

What happens after the gate

Accepted packs go to catalog match. Each required row is bound to a product you sell, or marked as a gap. Proven cells write back. Unproven cells stay blank. Healthcare equipment packs (GPO, hospital, VA) use the same gate; they are an industry slot, not a different product.

Verwandte Begriffe

Write-backGoods specCatalog match

Hersteller-Bid-Desk

MedTech-Ausschreibungsautomatisierung (Definition)Beste Tender-Management-Software 2026Tender-Management-Software-Vergleich
Preis erhalten

Grenzüberschreitende Rechtsarbeit.
Bepreist, bevor sie beginnt.

Sagen Sie uns, wohin Sie gehen und was Sie tun, und wir machen daraus ein Matter Pack, das zugelassene Anwälte vor Ort bepreisen können.

Pack gate beim Rückschreiben der Originaltabelle